- Supply and construction of a 2km, 2-circuit 220kV underground cable line.
- Supply of equipment for the 220kV underground cable system, optical cable, grounding; Installation, connection, and testing during installation, trial operation, and acceptance testing for the entire project.
- Installation of the underground cable temperature monitoring system (16-channel single-mode DTS cabinet) for the entire project