Supply, pulling, spreading, and installation of a 2-circuit 110kV underground cable line, with a length of over 7km
Project overview
Investor: Hanoi Power Corporation
Scale: Supply, pulling, spreading, and installation of a 2-circuit 110kV underground cable line, with a length of over 7km.
Location: Ba Dinh District, Tay Ho District, Hanoi City
Project completion year: 2022
Scope of work: Supply and installation of over 40.000m of 110kV underground cable type 1x1200mm2 and accessories. Testing of AC, DC, and PD underground cable