Huong Tan Project

Project overview

This is one of the first two projects in Vietnam to use domestically manufactured  steel pipe towers. It marks a significant turning point in design capabilities and the supply of new products by DAST, laying the foundation for EVN to use this type of tower for a series of subsequent projects, including the 500kV Circuit 3 Transmission Line.